男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Eight things you need to know about Hong Kong-Zhuhai-Macao Bridge

By He Shusi | chinadaily.com.cn | Updated: 2018-10-23 15:14
Share
Share - WeChat
The bridge seen during construction in November 2017. [Photo by ROY LIU/CHINA DAILY]

6. When did construction start? What was the cost?

The plan to build a link road across the Pearl River Estuary was first initiated by Hong Kong industrialist Gordon Wu Ying-sheung in 1983. After several twists and turns, the Feasibility Study started in March 2004 under State Council's approval. The study report was approved in October 2009, followed by a commencement ceremony on Dec 15 in the same year, chaired by then-vice-premier Li Keqiang in Zhuhai.

So far, the total cost of HZMB is about 120 billion yuan ($17.4 billion), of which the 29.6-km Main Bridge invested by three governments is about 48.1 billion yuan. The rest are investments by individual governments on their ports and link roads to the Main Bridge.

The cost allocation among the three governments shown as above is settled by the assessment of economic benefits they can get after the bridge opens.

|<< Previous 1 2 3 4 5 6 7 8 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 和田市| 云浮市| 边坝县| 太仓市| 沁水县| 香格里拉县| 多伦县| 通城县| 肇庆市| 林周县| 化州市| 仁怀市| 民丰县| 盐山县| 安平县| 乌海市| 固阳县| 霍城县| 华池县| 水富县| 昆明市| 洛浦县| 安陆市| 孝感市| 长沙市| 政和县| 鄂托克前旗| 梅河口市| 资讯 | 黔东| 长阳| 攀枝花市| 洪湖市| 昆山市| 华阴市| 曲阜市| 进贤县| 广水市| 湾仔区| 荆州市| 太谷县|