男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Long railway tunnel in Yunnan completed

By Li Yingqing in Kunming and Zhang Yu in Shijiazhuang | chinadaily.com.cn | Updated: 2019-10-17 15:12
Share
Share - WeChat
A 12.3-kilometer railway tunnel linking Dali and Lincang in Yunnan province is competed on Tuesday. [Photo by Wang Yixiang for chinadaily.com.cn]

During the past four years, the construction workers have dealt with various difficulties for this tunnel, including high seismic intensity as well as high geothermal and high hydraulic pressure, said Zhao Fan, a manager of the project department.

The successful construction of the tunnel will provide rich experience and technical guidance for the following construction of railways linking Sichuan province and Tibet autonomous region, as well as those linking Yunnan and Tibet, Zhao said.

The Dali-Lincang railway, with a length of 202 kilometers, is a key part of the international rail line linking China and Myanmar. It will require only three hours by train from Kunming, the capital city of Yunnan, to Lincang, after the railway is put into operation.

|<< Previous 1 2 3 4 5 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 灵台县| 台安县| 清丰县| 洛南县| 齐河县| 湖南省| 喀喇沁旗| 四子王旗| 射洪县| 吉安县| 思南县| 通道| 永仁县| 汉川市| 靖西县| 潢川县| 行唐县| 商洛市| 灵山县| 曲周县| 察雅县| 呼伦贝尔市| 西盟| 邵阳县| 中山市| 阿荣旗| 金堂县| 商南县| 延津县| 安多县| 义马市| 收藏| 海南省| 望奎县| 资兴市| 古浪县| 垫江县| 广水市| 灯塔市| 六盘水市| 武威市|