男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Europe

Laying of last pipe of Nord Stream 2 pipeline completes

Xinhua | Updated: 2021-09-07 09:59
Share
Share - WeChat
This picture posted on the website of Russian energy giant Gazprom shows Nord Stream 2 pipe-laying operations in German territorial waters.

MOSCOW - The last pipe of the two strings of the Nord Stream 2 pipeline was welded, Nord Stream 2 AG, the operating company, said in a press release Monday.

"On September 6, 2021, specialists on the laybarge Fortuna welded the last pipe of the two strings of the Nord Stream 2 Pipeline," the company said.

"As the next step, the section of the pipe coming from the German shore will be connected to the section coming from the Danish waters in a so-called above water tie-in," it added.

The company intends to put the Nord Stream 2 gas pipeline into operation before the end of the year. It said the project will ensure gas supply security and reliability, and "contribute to meeting long-term needs of the European energy market for gas imports."

The 1,230-km gas pipeline would bring 55 billion cubic meters of gas annually from Russia to Germany through the Baltic Sea.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 子长县| 南木林县| 兴宁市| 英吉沙县| 巴彦县| 连城县| 通辽市| 杂多县| 沂南县| 岑溪市| 睢宁县| 望城县| 甘谷县| 家居| 朝阳市| 浦江县| 江西省| 原平市| 涟水县| 象山县| 北宁市| 永丰县| 福安市| 宁波市| 霍城县| 大兴区| 藁城市| 当雄县| 炉霍县| 岳普湖县| 黑河市| 徐州市| 石楼县| 策勒县| 丘北县| 南丹县| 郓城县| 金寨县| 兴和县| 台山市| 铁力市|