男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Americas

US further delays Artemis moon missions following technical problem in spacecraft

Xinhua | Updated: 2024-12-06 10:34
Share
Share - WeChat
Reid Wiseman, commander of NASA's Artemis II mission to the moon, speaks during a news conference about the agency's Artemis campaign at the James E. Webb Auditorium at NASA Headquarters in Washington, DC, December 5, 2024. [Photo/Agencies]

LOS ANGELES -- NASA on Thursday announced delays in its Artemis moon exploration program following a technical problem identified in its Orion spacecraft.

NASA is now targeting April 2026 for Artemis II, its first crewed moon mission, and mid-2027 for Artemis III, a historic moon landing mission exploring the lunar South Pole region.

Artemis III will be the first mission to return U.S. astronauts to the surface of the moon in more than 50 years.

The agency previously set September 2025 for Artemis II, and September 2026 for Artemis III.

The delay came after NASA concluded the examination of a technical problem happened during the agency's Artemis I mission in 2022.

The Artemis I flight test, carrying the Orion spacecraft, was launched on Nov. 16, 2022, from NASA's Kennedy Space Center in Florida. The Artemis I mission was the first integrated flight test of the agency's deep space exploration systems: the Orion spacecraft, the Space Launch System (SLS) rocket, and ground systems.

During the Artemis I mission, the Orion spacecraft experienced an unexpected char loss across its heat shield, according to NASA.

Extensive analysis, including from more than 100 tests at unique facilities across the country, determined the heat shield on Artemis I did not allow for enough of the gases generated inside a material called Avcoat to escape, which caused some of the material to crack and break off.

Avcoat is designed to wear away as it heats up and is a key material in the thermal protection system that guards Orion and its crew from the nearly 5,000 degrees Fahrenheit of temperatures that are generated when Orion returns from the moon through Earth's atmosphere, according to NASA.

Approximately 200 Avcoat samples were removed from the Artemis I heat shield at NASA's Marshall Space Flight Center in Alabama for analysis and inspection.

"We took our heat shield investigation process extremely seriously with crew safety as the driving force behind the investigation," said Howard Hu, manager of Orion Program, NASA's Johnson Space Center in Houston. "The process was extensive. We gave the team the time needed to investigate every possible cause, and they worked tirelessly to ensure we understood the phenomenon and the necessary steps to mitigate this issue for future missions."

Engineers already are assembling and integrating the Orion spacecraft for Artemis III based on lessons learned from Artemis I and implementing enhancements to how heat shields for crewed returns from lunar landing missions are manufactured, to achieve uniformity and consistent permeability, according to NASA.

The Orion spacecraft, built by NASA and prime contractor Lockheed Martin, is currently the only spacecraft capable of crewed deep space flight and high-speed return to Earth from the vicinity of the moon.

On NASA's Artemis moon exploration missions, Orion will carry the crew to space, provide emergency abort capability, sustain the crew during space travel, and provide safe re-entry from deep space return velocities.

With the Artemis campaign, NASA plans to land the first woman, first person of color, and its first international partner astronaut on the moon, and establish long-term exploration for scientific discovery and preparation for human missions to Mars.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 湛江市| 丁青县| 中超| 四子王旗| 稻城县| 若尔盖县| 芜湖市| 阜阳市| 宁国市| 吉木乃县| 江达县| 鄂托克旗| 金湖县| 富裕县| 长武县| 乌拉特前旗| 张家口市| 长沙县| 工布江达县| 宁夏| 五河县| 通许县| 南丰县| 孝昌县| 柞水县| 九寨沟县| 肇州县| 平武县| 西贡区| 芮城县| 高邮市| 波密县| 伊川县| 五寨县| 青阳县| 卓尼县| 来宾市| 正安县| 湟中县| 中阳县| 福州市|