男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

US EUROPE AFRICA ASIA 中文
Business / Industries

China's newly installed wind power capacity grows 13% in Q1

(Xinhua) Updated: 2016-04-27 07:55

China's newly installed wind power capacity grows 13% in Q1

Workers with the power supply company in Chuzhou, Anhui province, check the transmission network under the State Grid before it is connected with a local wind power farm. SONG WEIXING / FOR CHINA DAILY

BEIJING - Newly installed wind power capacity in the first quarter reached 5.33 gigawatts, up 13 percent over the same period last year, according to the National Energy Administration (NEA) on Tuesday.

By the end of March, China had 134 gigawatts installed wind power capacity, up 33 percent compared to the figure by March last year, the NEA said.

However, wind-power use was falling due to wastage.

The average usage of wind power in the first three months was 422 hours, 61 less than the same period last year, the NEA said.

Wind power wasting reached 19.2 billion kilowatt hours, an increase of 8.5 billion kilowatt hours compared with the same period last year, the NEA added.

Hot Topics

Editor's Picks
...
主站蜘蛛池模板: 衢州市| 黄浦区| 江陵县| 鹤岗市| 巫山县| 久治县| 成安县| 二连浩特市| 山丹县| 宁乡县| 鄂尔多斯市| 咸丰县| 青铜峡市| 阿荣旗| 灌云县| 涡阳县| 军事| 车险| 永康市| 尚义县| 海城市| 嫩江县| 如东县| 巩留县| 囊谦县| 慈利县| 遂平县| 聊城市| 吉安市| 孟津县| 河北区| 喀喇| 沙田区| 康马县| 洱源县| 普宁市| 武穴市| 平湖市| 丰镇市| 黄梅县| 墨江|