男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / Society

Beijing to shut coal-fired boilers to clean up air

By Zheng Xin | China Daily | Updated: 2013-05-27 02:59

Beijing has vowed to eliminate most coal-fired boilers in the city center by the end of 2015 to reduce pollution from fine particulate matter, especially during the heating season.

After reducing coal use by 700,000 metric tons last year, the capital plans to cut another 1.4 million tons this year and use no more than 21.5 million tons, according to the 2013 coal consumption reduction plan released by the city's Environmental Protection Bureau and Commission of Development and Reform.

Beijing to shut coal-fired boilers to clean up air

Workers with the Beijing District Heating Group destroy two coal delivery channels with cranes on April 25, marking the beginning of the transformation of energy from coal to gas in the last coal-burning power plant in Beijing.?CHENG NING / FOR CHINA DAILY

The capital used 26.35 million tons of coal in 2010, the environmental bureau said.

Beijing still has a large number of coal-fired central heating boilers that give off large amounts of coal dust, and noise during the heating season.

Richard Saint Cyr, a family medicine doctor at United Family Health in Beijing, said he has noticed an uptick in discussions about the worsening air quality with many patients since winter.

He said that air pollution in the past winter was unusually serious and he had never witnessed such collective anxiety in Beijing.

Fine particulate matter poses a serious threat to people's hearts and lungs, he said.

Shang Wenchao, 28, a lifelong Beijing resident, said he used to clean his nostrils before going to sleep in winter because the air he breathed was filled with soot from burning coal.

"You have to wear a mask every day while outdoors or you would be eating coal," he said.

Shang said the situation is much better now, but the pollution is still worse in the winter because of the coal-fired boilers.

In response, the city's Environmental Protection Bureau is taking action has said it will replace coal-fired boilers within the Fourth Ring Road with clean energy by the end of 2015.

All coal-fired boilers with a capacity of generating 20 tons of steam per hour and above will be replaced with clean energy by the end of 2015, it said.

The last five coal-fired boilers at Shougang Machinery Co's heavy machinery branch in the Shijingshan district were shut down in March, making Shijingshan the third city district without coal-powered heating, after Xicheng district and Dongcheng district.

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 榆中县| 平阳县| 丰台区| 东山县| 铜川市| 屏边| 龙门县| 芮城县| 临高县| 达日县| 哈巴河县| 锡林浩特市| 读书| 满洲里市| 永修县| 诸城市| 庆云县| 龙江县| 临沂市| 莲花县| 商河县| 乐清市| 南溪县| 远安县| 罗田县| 奉新县| 安福县| 乐清市| 肃南| 桑日县| 洱源县| 息烽县| 绵竹市| 邛崃市| 浏阳市| 全椒县| 敖汉旗| 太白县| 泰宁县| 深州市| 师宗县|