男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

USEUROPEAFRICAASIA 中文雙語Fran?ais
Home / World

Nuclear plants request restart

By Agencies in Tokyo | China Daily | Updated: 2013-07-09 07:10

 Nuclear plants request restart

Activists demonstrate on Sunday in Avignon, France, to protest against nuclear projects. Boris Horvat / Agence France-Presse

Japanese nuclear operators applied on Monday to restart reactors under new rules drawn up after the Fukushima disaster, but early approval is unlikely as a more independent regulator strives to show a skeptical public it is serious about safety.

The ruling Liberal Democratic Party of Japan and the utilities are eager to get reactors running again, with Prime Minister Shizo Abe singling out reining in soaring fuel costs as a key part of his economic reform plans.

But the pro-nuclear LDP has to tread carefully to avoid compromising the independence of the new regulator, which is battling to build credibility with a public whose faith in nuclear power was damaged after meltdowns at Tokyo Electric Power Co's Fukushima Daiichi station.

The Nuclear Regulation Authority has said it will take at least six months to review nuclear units, after which the consent of communities hosting reactors is needed.

The NRA calls the level of the nuclear regulations the world's toughest. Kyodo News said that utilities may also choose to give up efforts to restart some of the country's 50 commercial reactors and abandon them rather than investing in expensive safety measures.

Four regional utilities filed applications to restart 10 reactors at five nuclear power plants in Hokkaido, Fukui, Ehime and Kagoshima prefectures on Monday.

Among those applying for restarts, reactors that could power up before others include the No 3 unit at Shikoku Electric Power Co's Ikata plant in Ehime prefecture, which has been found not to have geologic faults and has already prepared a newly required seismic-isolated emergency response center, Kyodo News reported.

The regulations also stipulate reactors must have a venting system with filters that can reduce the amount of radioactive substances when pressure needs to be released from reactor containers during emergencies. However, pressurized water reactors such as the No 3 unit at the Ikata plant are given a five-year grace period to meet the requirement.

The requirements are stricter for aging units, which not only will have to comply with the new regulations but also undergo inspections to continue to operate beyond 40 years, according to local media reports.

All but two of Japan's 50 reactors have been closed following the disaster in March 2011, which forced 160,000 people from their homes, many of whom are unlikely to be able to return for decades.

Reuters-Xinhua

Nuclear plants request restart

(China Daily 07/09/2013 page12)

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 龙胜| 拜城县| 德兴市| 怀柔区| 湖州市| 巴彦县| 汪清县| 平果县| 新营市| 隆德县| 五原县| 清水河县| 元朗区| 湄潭县| 保康县| 双牌县| 巩留县| 教育| 拉孜县| 睢宁县| 新乡市| 乌拉特后旗| 乌兰浩特市| 新丰县| 厦门市| 元谋县| 洪湖市| 宝山区| 巫山县| 青神县| 阿荣旗| 明水县| 武平县| 巫溪县| 张掖市| 南充市| 辽中县| 涟水县| 麟游县| 闵行区| 舒兰市|