男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

  Home>News Center>China
       
 

China to build thermonuclear fusion reactor
By Yu Zheng (Xinhua)
Updated: 2005-07-01 08:38

A leading Chinese plasma physicist said Thursday China might build its own thermonuclear experimental reactor, which would be expected to supply sustained electricity for the world's most populous country.

While building their own sophisticated devices in thermonuclear reaction, Chinese scientists have already participated in the International Thermonuclear Experimental Reactor (ITER), a testing step between today's plasma physics studies and tomorrow's electricity-producing fusion power plants.

The scientist, who has access to the ITER, said to Xinhua on condition of anominity, "The ultimate goal of the Chinese scientists is to build thermonuclear experimental reactors with their own efforts."

"International cooperative endeavors like the ITER make us keepabreast of the world's most advanced technologies," He said. "We're entitled to share all top-notch know-how once we enter the global consortium."

Using deuterium, which is in seawater, as fuel for reactions, a hydrogen plasma torus operating at over 100 million Celsius degrees will produce 500 megawatts of fusion power. The ITER, which means "the way" in Latin, is based on the idea.

All the commercialized nuclear reactors in the world were designed for fission, a process contrary to the ITER's fusion, and have to consume irrecycled mineral resources such as uranium and plutonium. Waste of fission reactors is radioactive while a fusionreaction is rather environment-friendly.

Chinese scientists started to develop a fusion operation torus four decades ago in mountains southwest of inland Sichuan Province.

In the late 1980s, the United States and Japan launched the ITER, which was joined by China in 2003. Among the six partners ofthe 10 billion-euro ambitious plan, the European Union will cover 50 percent of the total budget. The remaining five, the US, Japan,Russia, the Republic of Korea and China, will pay 10 percent each.

Since 2003, the Chinese team has mandated a batch of important missions. The ITER international coordinator, Japanese physicist Yasuo Shimomura said, "The work done by the Chinese is the most impressive."

The Chinese Academy of Sciences (CAS) Institute of Plasma Physics is developing an Experimental Advanced Superconducting Tokamak (EAST), one prototype of the ITER.

The EAST, which costs 200 million yuan (24 million US dollars) and is scheduled for completion late this year, could operate at over 100 million Celcius degrees and produce electricity in a consecutive 1,000 seconds, which will be a world record.

"The EAST is the only prototype nearest to the ITER and will be unbeatable in at least one decade," an official with the CAS Bureau of Basic Research said.

After fierce diplomatic manoeuvers, the six partners agreed Tuesday in Moscow to construct the first ITER at Cadarache, near Aix-en-Provence, France, overriding Japan's competition for hosting the innovative reactor.

It is ready to start ITER construction and the first plasma operation might be in 2016. But the most optimistic estimation on first commercialization of ITER said it needs at least half a century.

After the deal was clinched in Moscow, Chinese Minister of Science and Technology Xu Guanhua said, "As China is short of energy, global research endeavors for energy supply solutions meetour strategic interest."



Special police detachment established in Xi'an
Panda cubs doing well in Wolong
Suspect arrested in Taiwan
  Today's Top News     Top China News
 

Taiwan's KMT Party to elect new leader Saturday

 

   
 

'No trouble brewing,' beer industry insists

 

   
 

Critics see security threat in Unocal bid

 

   
 

DPRK: Nuke-free peninsula our goal

 

   
 

Workplace death toll set to soar in China

 

   
 

No foreign controlling stakes in steel firms

 

   
  No foreign controlling stakes in steel firms
   
  China-made telescopes race to space
   
  'No trouble brewing,' beer industry insists
   
  HK investors cautious on mainland homes
   
  Law in pipeline to ban money laundering
   
  Overseas students test their Chinese abilities
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Advertisement
         
主站蜘蛛池模板: 遵义县| 临颍县| 温宿县| 岳池县| 民乐县| 拉孜县| 平山县| 泸溪县| 东安县| 朝阳县| 民乐县| 曲松县| 凌海市| 荃湾区| 霸州市| 包头市| 盘山县| 嘉峪关市| 新化县| 闽清县| 塔城市| 涿州市| 大悟县| 阿图什市| 伊宁市| 都安| 巴青县| 香格里拉县| 额尔古纳市| 贵港市| 隆安县| 揭东县| 商城县| 沭阳县| 晋城| 通渭县| 卫辉市| 任丘市| 江川县| 象山县| 高平市|