男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

  Home>News Center>China
       
 

Tibet rail construction completed
By Cao Desheng (China Daily)
Updated: 2005-10-15 06:55

A ceremony is planned on Saturday in Lhasa, capital of Southwest China's Tibet Autonomous Region, to celebrate the completion of the Qinghai-Tibet Railway after four years of construction.

The railway, which connects Tibet with the rest of China, is the most elevated track in the world.

Once signalling and track testing is completed in the next 15 months, it will be possible to travel from Beijing to Lhasa in 48 hours.

The gigantic project, which involves an investment of 33 billion yuan (US$ 4.7 billion), is part of the nation's efforts to build up the underdeveloped western regions.

The railway, linking Lhasa with Golmud in Qinghai, extends 1,142 kilometres on the Qinghai-Tibet Plateau. It boasts the world's highest railway station, at Tanggula, located 5,068 metres above sea level.

With an average altitude of 4,500 metres, the line has 960 kilometres at 4,000 metres above sea level.

About 550 kilometres of the railway runs on frozen earth that is vulnerable to climate change, which posed a major challenge to construction.

The line is expected to attract tourists, traders and ethnic Chinese settlers who currently have to take either expensive flights to Lhasa or bone-shaking bus rides.

"The railway project will contribute enormously to the balance of the nation's economic growth as a whole as well as the region's development," Lin Yueqin, an economic researcher at the Chinese Academy of Social Sciences, said in a telephone interview with China Daily.

The railway also will greatly reduce transport costs for materials entering and exiting Tibet, which will help both domestic and foreign investment there.

Traffic has been one of the major obstacles to economic development of Tibet, which makes up about one-eighth of China's territory and was the only region without a single metre of operating railway.

More than 95 per cent of the cargo transported in and out of Tibet, and 85 per cent of the passengers, go by road from Qinghai or Sichuan, according to the Ministry of Communications.

Because of the high cost of transport, raw materials in Tibet cannot easily be transported out. The volume of cargo entering the region far exceeds that exiting the region.

"The railway will also help the region's tourism industry as Tibet is an attractive tourist destination to domestic and international travellers," Lin said.

The railway project drew concerns about possible environmental losses because the Qinghai-Tibet Plateau has a vulnerable ecosystem. Damaged vegetation cannot easily be restored.

Targeting such doubts, the railway has taken into account ecosystem protection, with at least 2 billion yuan (US$240 million) spent on conservation efforts, Xinhua News Agency reported.



Fire destroys a Hebei company
Wolfowitz in Northwest China
Military drill for upcoming China-ASEAN expo
  Today's Top News     Top China News
 

Shenzhou VI fine-tunes orbit on the third day in space

 

   
 

Substantial results expected at G-20 meet

 

   
 

Tibet rail construction completed

 

   
 

China reports 126,808 HIV/AIDS cases

 

   
 

Internet creates new wave of pop stars

 

   
 

Avid spectators embrace Formula 1

 

   
  Shenzhou VI fine-tunes orbit on the third day in space
   
  Substantial results expected at G-20 meet
   
  HIV-positive cases estimated at 840,000
   
  Tibet rail construction completed
   
  Roller coaster accident kills Indian worker
   
  On site mediation ordered
   
 
  Go to Another Section  
 
 
  Story Tools  
   
  News Talk  
  It is time to prepare for Beijing - 2008  
Advertisement
         
主站蜘蛛池模板: 南川市| 越西县| 同德县| 清苑县| 什邡市| 安吉县| 孟村| 栾城县| 南通市| 万年县| 中方县| 祁连县| 太保市| 巨鹿县| 大名县| 彰化市| 高阳县| 新和县| 沧源| 石景山区| 赤峰市| 新乐市| 永宁县| 印江| 南郑县| 宜黄县| 卢湾区| 馆陶县| 中西区| 邻水| 如皋市| 广河县| 湘潭县| 尤溪县| 蛟河市| 新源县| 扎赉特旗| 腾冲县| 东光县| 思茅市| 额济纳旗|