Piping Construction

Updated: 2014-05-17 19:13

Print LargeMediumSmall

1. Power

Piping Construction

The area has the 110-KV Majinpu Transformer Substation with 10-KV power cable outlets and 21 10-KV lines that are 29.66-km long, and costing 100 million yuan. The substation cost 43 million yuan ($6.88 million) and began operation in November 2008, providing power for the Kunming Hi-Tech Industrial Base.

Piping Construction

2. Gas

Piping Construction

The area has 23 gas pipelines which cost 24.6 million yuan and are 30-km in length, along Beixin Rd and North Park Rd and elsewhere.

Piping Construction

3. Water

Piping Construction

The area has 21 water pipes, running 29.66 km, with a 3.8-km pipe for the Majinpu Water Purification Plant, costing 134 million yuan and going operational on Dec 30, 2008, with a capacity of 40,000 tons/day. It began supplying water to the Kunming New City Hi-Tech Industrial Base on May 1, 2009.

Piping Construction

 